St George’s Health & Wellbeing Hub
Full infrastructure and fit-out comprising of 110 FCUs and 168 bathrooms
- Infrastructure installation of risers, distribution, installation of AHU using a mixture of welded, Victaulic and screwed barrel for the install
- Prefabricated modules in several areas for distribution
- Drainage system HDPE prefabricated and installed
Lamborghini Garage, Hatfield
Value 100k
• Installation of a prefabricated sprinkler system in the showrooms and workshops
Everyone Active
Value 120k
- Plant room installation
- Infrastructure distributon
- Toilet core and changing areas
Ledian Farm retirement village
Value 500k
- Welded plant rooms
- External underground Gas, bcw and fire hydrant services
- Infrastructure distribution throughout including LTHW CHW and BCWS and the connection of the AHU’s
- Public health drainage and rain water
- Apartment fit out 1st and 2nd fix
- Communal areas
Oaklands
66 apartments
Value – £330k
- Installation of HDPE public health drainage and rainwaters
- Infrastructure LTHW and BCW service risers and distribution
- 1st and 2nd fix apartment fit out
Guys & St Thomas’ and St George
- Upgrade of systems requiring us to lead with new routes of containments for fibre upgrades
Wembley park
633 apartments across 4 blocks and communal areas
Value 1.25m
- Installation of HDPE public health drainage to circa over 250 stacks throughout the 4 blocks
- Installation of cast iron drainage and rain water throughout the basement car park areas
- 1st and 2nd fix apartment fit out to 633 plots
- Mechanical and public heath services to communal areas